This is top shelf stuff Romina, thanks so much! I was wondering, in terms of tracking and measuring (the Day 2 stuff) is there a set of what to track, what/how to measure that you'd recommend as a reference?
I'd assume some of this is based on the context of the business and the state/condition of the application and design system being measured, but it's a bit of a murky area for me and any clarity you can bring would be really welcome 🙏
This is top shelf stuff Romina, thanks so much! I was wondering, in terms of tracking and measuring (the Day 2 stuff) is there a set of what to track, what/how to measure that you'd recommend as a reference?
I'd assume some of this is based on the context of the business and the state/condition of the application and design system being measured, but it's a bit of a murky area for me and any clarity you can bring would be really welcome 🙏
Really good analysis, thank you for posting!